2012 Lower Lateral Sewer Replacement Project, Job No. 122716

Bids Due: 2:00 P.M. on February 28, 2012 - Project Details Full details

Project Description: You are invited to bid on work comprising the construction of the following 2012 Lower Lateral Sewer Replacement Project in Vallejo, CA for the Vallejo Sanitation and Flood Control District. This work includes the following Project:

2012 Lower Lateral Sewer Replacement – Project No. 122716
Work includes, but not limited to, replacing 58 lower laterals, 1750 linear feet of 4-inch pipe by pipe bursting construction, 58 District cleanouts, 56 sewer main clay wyes, property restoration, traffic control and surface restoration (curb, gutter, sidewalk, driveway, and street).

The Engineer’s cost estimate is between $225,000 and $250,000

“Pre-Bid Conference”: NO PRE-BID CONFERENCE FOR THIS PROJECT. CONTRACTOR IS ADVISED TO INSPECT PROJECT SITE, PROPERTY TABLE AND GENERAL NOTES BEFORE SUBMITTING BID.

Contact: Charles Canepa - ccanepa@vsfcd.com 644-8949 ext. 233
 

Lake Dalwigk Improvements - Habitat Enhancement Project Job No. 063827

Bids Due: 2:00 P.M. on March 3, 2011 - Project Details Full details Addendum #1 Addendum #2

Supporting Documents: (Final Initial Study / Mitigated Negative Declaration) - (Appendices) - (Pre-bid Sign-in) -
(Final Geotechnical Report) - (Bid Specs) - (Bid Plans) - (Grading Plans)

Project Description: You are invited to bid on work comprising the construction of the flood control improvements in and around Lake Dalwigk in Vallejo, CA for the Vallejo Sanitation and Flood Control District. This project includes:

  • construction of a new low flow outlet structure, slide gate, bar rack, hand rails, and pipeline
  • replacement of an existing bar rack with a new bar rack on the existing Lake Dalwigk outlet structure
  • replacement of the existing hand rails with new hand rails on the existing Lake Dalwigk outlet structure
  • removal of vegetation from the lake bed
  • excavation and grading within the lake bed
  • construction of storm drain piping and a headwall
  • placement of rock rip rap
  • replacement of a concrete sidewalk with an all weather access road and AC walkway
  • construction of piles and booms
  • and miscellaneous work for a complete and operational system. 2.02

    The Engineer’s cost estimate is $1.6 million to $1.8 million.

    “Pre-Bid Conference” will be held at Vallejo Sanitation and Flood Control District office -450 Ryder Street, Vallejo CA, at 10:00 A.M. on Tuesday February 1. Attendance at the pre-bid conference is a mandatory condition for submitting a bid.

    Contact: Gus Silva - gussilva@vsfcd.com 644-8949 ext. 236
     